Building & Pricing a Quote Since v2.0
- Price every room clearly (Kitchen, Main Switchboard, Garage) so both your client and your site crew understand the exact scope.
- Drop in 4-stage Pre-Builds (
PB-GPO-DBL,PB-DL-LED) so rough-in cable, clips, labour, and fit-off gear are never forgotten. - Watch live total cost, sell price (Ex. GST and Inc. GST), gross profit dollars, and stage totals update as you estimate.
When To Use It
Open any Draft quote from Quotes & Jobs whenever you are doing a takeoff from house plans, pricing a switchboard upgrade, or adding client variations before locking approval.
Rooms and Groups
Grouping a quote by room or area mirrors how electricians walk a site.
- Click + Add Room/Group (or Manage Rooms/Groups once you have custom rooms).
- Create rooms in logical walk-through order (Main Switchboard, Kitchen, Living & Dining, Master Bedroom, Exterior).
- Use Manage Rooms/Groups to reorder rooms up/down, rename a room, or remove an empty room.
Deleting a Room Safely
If you delete a Room/Group that still contains items, SparkyQuote never deletes your priced items — it moves them safely into Ungrouped (Quote Root) so you can reassign them.
Adding Pre-Builds and Single Items
- Click + Add Items on the toolbar (or directly inside a room panel to pre-select that room).
- Choose Pre-Builds (reusable multi-stage kits) or Catalog Items (single labour, material, fixture, or certificate lines).
- Enter quantities and add multiple items in one batch before clicking Add to Quote.
- Adjust any quantity inline, click Edit to fine-tune parts inside a Pre-Build for that specific room, or use ⋯ → Move to Room to relocate a line.
| Room / Group | Code | Description | Qty | Stage Breakdown | Sell Total (Ex. GST) |
|---|---|---|---|---|---|
| Main Switchboard | PB-SWB-12P | 12-Pole RCBO Switchboard Upgrade | 1 | Demo, Rough In, Fitoff, Commission | $ 1,890.00 |
| Kitchen | PB-GPO-DBL | Double 10A GPO Point (Iconic) | 8 | Rough In + Fitoff | $ 1,320.00 |
| Kitchen | PB-OVEN-32A | Dedicated 32A Oven Sub-Circuit | 1 | Rough In + Fitoff + Commission | $ 485.00 |
| Kitchen | LAB-ELEC-HR | Induction Cooktop Cut-out & Test | 1.5 | Commission | $ 180.00 |
| Quote Subtotal (Ex. GST) | $ 3,875.00 | ||||
| GST (10%) | $ 387.50 | ||||
| Quote Total (Inc. GST) | $ 4,262.50 |
Quote Summary Rail
The right-hand Quote Summary rail keeps your numbers visible while you scroll through long room lists:
- Overview Tab: Shows Total Cost (Ex. GST), Total Sell (Ex. GST), GST (10%), Total (Inc. GST), Gross Profit ($), Gross Margin (%), and amount already invoiced.
- Stages Tab: Splits the quote across Demo, Rough In, Fitoff, and Commission so you know exact progress claim values before work starts.
- Rooms/Groups Tab: Shows the subtotal for every room so you can quickly answer a builder asking "How much is just the Alfresco?".
Filtering Long Quotes
Use the Stage Tabs (All Stages, Demo, Rough In, Fitoff, Commission) and the Room/Group combobox at the top of the quote to inspect only Rough-In quantities before ordering materials from your wholesaler.