SparkyQuote HelpSparkyQuote Help
Start Here
How-To
Guides
Release v2.0
Start Here
How-To
Guides
Release v2.0
  • Getting Started

    • First-Day Trade Setup
    • Sign In & Daily Navigation
  • How-To Scenarios

    • Common Electrician How-To Scenarios
    • How to Quote a 3-Bedroom Residential Renovation
    • How to Handle a Wholesaler Price Rise Safely
    • How to Claim Rough-In & Fit-Off Progress Invoices
    • How to Send One Monthly Consolidated Builder Invoice
    • How to Update a Pre-Build After Frequent Site Changes
    • How to Onboard a New Estimator Safely
    • How to Update Labour Rates, Markups & Business Settings
  • Quotes & Jobs

    • Quotes & Jobs Directory
    • Building & Pricing a Quote
    • AI Plan Takeoff
    • Price Protection & Quote Approval
  • Pre-Builds

    • Pre-Builds (4-Stage Electrical Kits)
    • Pre-Build Variance Tracking (>20% Alerts)
  • Invoices

    • Invoices & Progress Claims
    • Formatting Client Invoices & Audit Parity
    • Consolidating Multiple Quotes & Merging Drafts
  • Integrations

    • Syncing with Xero
  • Clients & Suppliers

    • Clients & Job Sites
    • Suppliers & Wholesaler Profiles
    • Importing Catalog & Supplier Price Lists
    • Prices & Catalog
  • Settings & Team

    • Business Settings
    • Team, Roles & Permissions
    • My Profile & Switching Companies
  • What's New (v2.0)

    • What's New

Pre-Build Variance Tracking (>20% Alerts) Since v2.0

What This Does For You
  • Stop under-quoting jobs because your master kit still assumes 6m of cable when real sites consistently take 10m.
  • Automatically highlight any Pre-Build that estimators override on more than 20% of quotes (threshold configurable in Business Settings).
  • Promote the real-world quantity back into your master Pre-Build in one click so every future quote is more accurate.

When To Use It

Check the Frequent Changes tab in Pre-Builds once a month (or whenever you notice an amber badge such as 2 Frequent Changes (>20%) at the top of the Pre-Builds screen).

Spotting Frequent Site Changes

Whenever an estimator opens a Pre-Build inside a quote and changes a part quantity (for example bumping Rough-In cable from 8m to 12m or adding 0.25 hr labour), SparkyQuote tracks that change automatically.

  1. Open Pre-Builds and switch to the Frequent Changes tab to view the sortable table of all Pre-Builds (filter by Status: All, Review Needed, or OK).
  2. Click any Pre-Build code, name, or Inspect to open the Item Change Analysis workbench modal.
  3. Review each item pattern grouped by SKU and installation phase — including edit count, Master Qty vs Avg Quote Qty (hover for Min/Median/Max), and estimated Cost/Sell Ex. GST impact. Click any SKU to quick-peek its catalog pricing.
  4. Adjust Apply Qty if needed, then click Promote (or Remove Item at 0) to update the master kit for that item only, or open ⋯ → Dismiss Pattern to clear one-off site outliers without changing the master kit.
Worked ExampleCatching Hidden Cable Loss on Downlight Points

Over your last 10 residential quotes using PB-DL-LED (LED Downlight Point):

  • Your master Pre-Build allowed 4m of 1.5mm² TPS cable per light.
  • Estimators manually increased it to 6m on 6 out of 10 quotes (60% variance) due to modern high-ceiling trusses.

SparkyQuote flags PB-DL-LED with a 60% Frequent Change alert. You click Promote to Master Pre-Build, updating the default from 4m to 6m. On your next 40-downlight house quote, that single fix recovers 80m of cable you would otherwise have absorbed out of profit.

Adjusting Your Alert Threshold

Default variance flagging triggers above 20%. You can tighten or relax this threshold anytime in Business Settings — Markups & Tax.